Boot device not found. Please install an operating system on your hard disk
Boot device not found. Please install an operating system on your hard disk
I graduated high school in 1985. This movie spoke to me at the time.
PORKCHOP SANDWICHES!
There were a number of sites that FF choked on, so I just ended up using Edge. uBlock works with it, and that’s about all I need for extensions.
Not sure how people decided that Google is more altruistic with data handling than Microsoft, but here we are, I guess.
There is the UnPinterested! extension for Chrome. I think it still works.
That was just a few years ago, right?
Haters gonna hate, I guess.
I appreciate the content.
I used to restore “barn bikes”, most of them were Japanese. It took me a while to figure out the difference between Japanese Industrial Standard (JIS) and Phillips screws. Of course over the years, a lot of the fasteners had already been cammed out by previous owners using a Phillips screwdriver in a JIS screw. I had to resort to the die grinder method far more than I’d have preferred.
Torx or Robertson, are the only ones worth a damn.
Yeah, the “difficult” part, I don’t understand. I’m 56 and figured out /kbin and Mastodon and how federation works within a few hours. So far, so good.
I was around for the early days of Fark, Digg, Twitter and Reddit. New sites are rough around the edges. That’s just the way it is. Things will get sorted in due time.
Just like assuming a perfectly spherical cow, or a frictionless surface, you can completely ignore the economics, the massive cost and schedule overages to make nuclear work.
Flamanville-3 in France started construction in 2007, was supposed to be operational in 2012 with a project budget of €3.3B. Construction is still ongoing, the in-service date is now sometime in 2024, and the budget has ballooned to €20B.
Olkiluoto-3 is a similar EPR. Construction started in 2005, was supposed to be in-service in 2010, but finally came online late last year. Costs bloated from €3 to €11B.
Hinkley Point C project is two EPRs. Construction started in 2017, it’s already running behind schedule, and the project costs have increased from £16B to somewhere approaching £30B. Start up has been pushed back to 2028 the last I’ve heard.
It’s no different in the US, where the V.C. Summer (2 x AP1000) reactor project was cancelled while under construction after projections put the completed project at somewhere around $23B, up from an estimate of $9B.
A similar set of AP1000s was built at Vogtle in Georgia. Unit 3 only recently came online, with unit 4 expected at the end of the year. Costs went from an initial estimate of $12B to somewhere over $30B.
Note that design, site selection, regulatory approvals, and tendering aren’t included in the above. Those add between 5-10 years to the above schedules.